Please bear with us during this inconvenience and be advised to have the necessary preparations and adjustments to necessary activities ahead of the following scheduled power interruption:
PURPOSES:
1. Tapping of RERI Armenia Solar Power Plant at structure 32 along Concepcion-Besma 69kV segment
2. Tapping/commissioning of Voltage Transformer at Concepcion 69kV switchyard
3. Transmission line maintenance
4. Upgrading of 10MVA to 20MV Power Transformer for Sta. Ignacia Sub-station
DATE: NOVEMBER 9, 2024 (Saturday)
TIME: 6:00 a.m. to 4:00 p.m.
AFFECTED AREA: TARELCO I Coverage Area (ALL TOWNS)